CDA has invited e-bids from top construction firms for a new cricket stadium near Sector D-12 in Islamabad under a two-stage EPC process.
New Cricket Stadium Planned Near Sector D-12
The Capital Development Authority (CDA) has moved a step closer to building a new cricket stadium in Islamabad by formally launching the bidding process for its construction. The proposed venue will be located near Sector D-12, at the foothills of the Margalla, giving the federal capital a dedicated international-standard cricket facility in a scenic setting.
This project has been under discussion for several years as Islamabad continues to grow in population and sporting activity. A purpose-built stadium is seen as essential to host national tournaments, training camps and potential international fixtures, while also providing better facilities for local fans.
Two-Stage EPC Bidding Under PPRA Rules
According to the invitation to e-bid issued by CDA’s Procurement and Contract Wing, the authority is seeking bids under the EPC (Engineering, Procurement and Construction) mode, using a two-stage, two-envelope process as per Public Procurement Regulatory Authority (PPRA) rules. This method is commonly used for large, complex projects where technical proposals and financial offers are evaluated separately.
Only well-reputed firms registered with the Pakistan Engineering Council (PEC) in Category C-A are eligible to participate. This highest-level PEC category is reserved for companies with strong financial strength, technical expertise and experience in executing major infrastructure developments, ensuring that the stadium project is handled by capable contractors.
Bidding Documents Available Through Online Portals
The tender notice states that detailed electronic bidding documents, including technical specifications, design requirements and terms and conditions, are available for registered bidders on government e-procurement portals such as EPADS and the PPRA website. Interested firms are expected to download these documents, study the requirements and prepare comprehensive technical and financial proposals.
By shifting to a fully digital process, CDA aims to improve transparency, reduce paperwork and make it easier for qualified firms from across the country to participate. The e-bidding platform also allows for better record-keeping and audit trails, which supports good governance in public procurement.
Bid Submission, Security and Opening Schedule
Firms intending to bid for the project must submit their proposals online through the EPADS system by 11:30am on 16 February 2026. Manual or paper-based bids will not be accepted, underscoring CDA’s shift toward electronic procurement for major projects.
Each bidder is required to provide bid security of 120 million rupees in the form of a pay order or Call Deposit Receipt (CDR) in favour of the DDO Procurement and Contract, CDA. The electronic bids will be opened the same day at 12:00 noon in the presence of the CDA Procurement Committee and authorised representatives of participating firms at the CDA Secretariat in Sector G-7/4, Islamabad.
What the New Stadium Means for Islamabad Cricket
A modern cricket stadium in Islamabad is expected to support the development of the game at multiple levels. For professional players, it can offer better training and playing conditions, while for fans it promises improved seating, safety and facilities compared with temporary or smaller venues.
If the project moves forward as planned, the new stadium could also strengthen Islamabad’s case to host high-profile domestic and international matches in the future. Alongside this, it may generate jobs during construction, boost local business activity on match days and add another landmark sports facility to the capital’s growing urban landscape.

